Business process management systems
strategy and implementation
Gespeichert in:
Verfasser / Beitragende:
James F. Chang
Ort, Verlag, Jahr:
Boca Raton :
Auerbach Publications,
2006
Beschreibung:
xv, 286 S. : Ill.
Format:
Buch
Online Zugang:
| LEADER | cam a22 4 4500 | ||
|---|---|---|---|
| 001 | 277902096 | ||
| 003 | CHVBK | ||
| 005 | 20201013121129.0 | ||
| 008 | 130818s2006 xxu 00 eng | ||
| 010 | |a 2005045248 | ||
| 015 | |a GBA5-11492 |2 bnb | ||
| 020 | |a 0-8493-2310-X | ||
| 035 | |a (IDSSG)000363131 | ||
| 035 | |a (LIBIB)000298605 | ||
| 035 | |a (IDSBB)005184163 | ||
| 035 | |a (NEBIS)005039352 | ||
| 035 | |a (RERO)R004188806 | ||
| 035 | |a (OCoLC)59360036 | ||
| 040 | |a DLC |b ger |d SzZuIDS HSG |e kids | ||
| 050 | |a HD58.87 |b .C429 2006 | ||
| 072 | 7 | |a s1in |2 rero | |
| 082 | 0 | |a 658.4/063 |2 22 | |
| 082 | 0 | |a 658.4040285 |2 22 | |
| 084 | |a QP 345 |2 rvk | ||
| 084 | |a ST 610 |2 rvk | ||
| 091 | |a DE010B8F2C9E7E6FC85C1C125737F00400AB1 |b iCapture | ||
| 100 | 1 | |a Chang |D James F. | |
| 245 | 1 | 0 | |a Business process management systems |b strategy and implementation |c James F. Chang |
| 264 | 1 | |a Boca Raton |b Auerbach Publications |c 2006 | |
| 300 | |a xv, 286 S. |b Ill. | ||
| 504 | |a Includes bibliographical references and index | ||
| 650 | 7 | |a Betriebliches Informationssystem |0 (DE-588)4069386-7 |2 gnd | |
| 650 | 7 | |a Prozessmanagement |0 (DE-588)4353072-2 |2 gnd | |
| 650 | 0 | |a Project management |x Data processing | |
| 650 | 0 | |a Management information systems |x Design | |
| 650 | 7 | |a GESCHÄFTSPROZESSE (UNTERNEHMENSFÜHRUNG) |x ger |0 (ETHUDK)000060353 |2 ethudk | |
| 650 | 7 | |a GESCHÄFTSPROZESSMANAGEMENT, GPM |x ger |0 (ETHUDK)000060399 |2 ethudk | |
| 650 | 7 | |a MANAGEMENTSYSTEM |x ger |0 (ETHUDK)000051682 |2 ethudk | |
| 650 | 7 | |a STRATEGISCHE UNTERNEHMENSFÜHRUNG |x ger |0 (ETHUDK)000042954 |2 ethudk | |
| 650 | 7 | |a WIRTSCHAFTSINFORMATIK + BETRIEBSINFORMATIK |x ger |0 (ETHUDK)000013695 |2 ethudk | |
| 650 | 7 | |a processus |0 (RERO)A010136169 |2 rerovoc | |
| 650 | 7 | |a système d'information (informatique) |0 (RERO)A010031478 |2 rerovoc | |
| 650 | 7 | |a Gestion d'entreprise |0 (RERO)A021001491 |2 rero | |
| 650 | 7 | |a organisation (structure) |0 (RERO)A010015383 |2 rerovoc | |
| 650 | 7 | |a Systèmes d'information |0 (RERO)A021005916 |2 rero | |
| 650 | 7 | |a Systèmes d'information de gestion |0 (RERO)A021060645 |2 rero | |
| 650 | 7 | |a Gestion |0 (RERO)A021102469 |2 rero | |
| 650 | 7 | |a Informatique |0 (RERO)A021001890 |2 rero | |
| 650 | 7 | |a Réingénierie organisationnelle |0 (RERO)A021052889 |2 rero | |
| 690 | 7 | |B u |a Quality management ; Process management ; Hypermedia markup language ; Management system ; Computer output to microfilm ; Remote procedure call ; Implication ; Business management ; Application integration ; Business application ; Simulation ; Data integration ; Object-oriented programming ; Implementation ; Invocation ; Architecture ; learning ; Business process ; Java ; Messaging ; Distributed object management ; Method invocation ; Fault location ; Client application ; Application ; Application program interface ; Sigma ; Improvement ; Administration ; Generation ; Use information ; Initiative ; Fiber sheet ; Product enhancement ; Language ; Information technology ; Business information ; Data bank ; Discrete event simulation ; Strategy ; reviews ; Integration technology ; Advent ; Execution ; Component technology ; Internet ; Reference model ; Future business ; standards ; Standard ; Messaging service ; Broker ; Enterprise service ; Participation ; Collaboration ; Drug interaction ; Quality program ; Workflow Management System ; Business activity ; Medical operation ; Convergence ; Lifecycle ; Workflow engine ; Mark-up language ; Integration product ; Developmental trend ; Organizational Structure ; employees ; Database connectivity ; Open system ; Protocol ; Workflow ; Type ; Access protocol ; Process engine ; Workplace ; Design environment ; Run time environment ; Definition language ; Choreography ; Methodology ; Lesson ; Project team ; Publication ; Quality ; Asset ; Enabler ; Business partner ; Income ; Deficiency ; Contact surface ; Client-server system ; Chemical elements ; Mode ; Event ; Connector ; Registry ; Appliance centre ; Application centre ; Designer ; Portal ; Chimney ; Last-in-first-out memory ; Direction ; Adjustement ; Infrastructure ; Change organization ; Process analysis |2 ids J1 | |
| 690 | 7 | |B u |a Cross-Enterprise ; Meta-Model ; Hub-Spoke |2 ids J2 | |
| 690 | 7 | |B u |a New York; Early Process Concepts; Top-Down Commitment; Other Process; Process-Centric Integration; Real-Time Process; Future BPMS Developments |2 ids J3 | |
| 690 | 7 | |B u |a Boca; Raton; xüi; xv; Remoting; Wf; WfMS; IT; MOM |2 ids J5 | |
| 691 | 7 | |B u |u QP 345 |a Informationsmanagement |2 libib XF | |
| 691 | 7 | |B u |a STRATEGISCHE UNTERNEHMENSFÜHRUNG |z ger |u 65,02.04.02 |2 nebis E1 | |
| 691 | 7 | |B u |a GESCHÄFTSPROZESSE (UNTERNEHMENSFÜHRUNG) |z ger |u 65,02.05.1 |2 nebis E1 | |
| 691 | 7 | |B u |a GESCHÄFTSPROZESSMANAGEMENT, GPM |z ger |u 65,02.05.11 |2 nebis E1 | |
| 691 | 7 | |B u |a WIRTSCHAFTSINFORMATIK + BETRIEBSINFORMATIK |z ger |u 65,03.10 |2 nebis E1 | |
| 691 | 7 | |B u |a MANAGEMENTSYSTEM |z ger |u 65,02.02 |2 nebis E1 | |
| 691 | 7 | |B u |a STRATEGIC MANAGEMENT |z eng |u 65,02.04.02 |2 nebis E1 | |
| 691 | 7 | |B u |a GESTION STRATÉGIQUE |z fre |u 65,02.04.02 |2 nebis E1 | |
| 691 | 7 | |B u |a BUSINESS PROCESSES (BUSINESS MANAGEMENT) |z eng |u 65,02.05.1 |2 nebis E1 | |
| 691 | 7 | |B u |a PROCESSUS COMMERCIAUX (GESTION D'ENTREPRISE) |z fre |u 65,02.05.1 |2 nebis E1 | |
| 691 | 7 | |B u |a BUSINESS PROCESS MANAGEMENT |z eng |u 65,02.05.11 |2 nebis E1 | |
| 691 | 7 | |B u |a GESTION DES PROCESSUS MÉTIERS |z fre |u 65,02.05.11 |2 nebis E1 | |
| 691 | 7 | |B u |a INFORMATIQUE DE GESTION (ÉCONOMIE D'ENTREPRISE) |z fre |u 65,03.10 |2 nebis E1 | |
| 691 | 7 | |B u |a BUSINESS DATA PROCESSING (BUSINESS ECONOMICS) |z eng |u 65,03.10 |2 nebis E1 | |
| 691 | 7 | |B u |a MANAGEMENT SYSTEM |z eng |u 65,02.02 |2 nebis E1 | |
| 691 | 7 | |B u |a SYSTÈME DE GESTION |z fre |u 65,02.02 |2 nebis E1 | |
| 856 | 4 | |u http://unisg.link/hm00180444 |z Inhaltsverzeichnis | |
| 856 | 4 | |u http://www.loc.gov/catdir/enhancements/fy0647/2005045248-d.html |z Abstract | |
| 898 | |a BK020000 |b XK020000 |c XK020000 | ||
| 909 | 7 | |a E51ANH-2005 |2 nebis E5 | |
| 909 | 7 | |a E40-20071030 |2 nebis EN | |
| 912 | 7 | |a bw |2 FL | |
| 912 | 7 | |a 171 |2 E01-20051226 | |
| 912 | 7 | |a E51D |2 E51-20051222 | |
| 949 | |B RERO |F RE01046 |b RE01046 |c RE010460003 |j DIUF 2.2.2 |s TIB 3230 | ||
| 949 | |B RERO |F RE61083 |b RE61083 |c RE610830001 |j J.1.0 CHA | ||
| 949 | |B LIBIB |F FLFHL |b FLFHL |c FHLBI |j QP 340 C456 |x NELFLFHL0907 | ||
| 949 | |B IDSSG |F HSG |b HSG |c EG |j QP 345 C456 | ||
| 949 | |B NEBIS |F E51 |b E51 |c E51WV |j C 5. 167 Ex. A | ||
| 949 | |B IDSBB |F B569 |b B569 |c 569WF |j IWI 9527 |x NELB5951003 | ||
| 949 | |B NEBIS |F E01 |b E01 |c MG |j BWI 16873 | ||
| 949 | |B NEBIS |F E51 |b E51 |c E51BW |j WM 658.404 Chan Bus | ||
| 950 | |B IDSSG |P 100 |E 1- |a Chang |D James F. | ||
| 950 | |B IDSSG |P 856 |E 4- |u http://unisg.link/hm00180444 |z Inhaltsverzeichnis | ||
| 950 | |B IDSSG |P 856 |E 4- |u http://www.loc.gov/catdir/enhancements/fy0647/2005045248-d.html |z Abstract | ||
| 950 | |B LIBIB |P 100 |E 1- |a Chang |D James F. | ||
| 950 | |B LIBIB |P 856 |E -- |u https://doc1.bibliothek.li/aaw/FLMF019902.pdf |z Inhaltsverzeichnis (pdf) |3 Inhaltsverzeichnis | ||
| 950 | |B IDSBB |P 100 |E 1- |a Chang |D James F. | ||
| 950 | |B NEBIS |P 700 |E 1- |a Chang |D James F. | ||
| 950 | |B RERO |P 100 |E 1- |a Chang |D James F. |0 (RERO)A012761726 |4 aut | ||
| 956 | 4 | |B IDSBB |C DSV51 |D DSV01 |a A100 |u http://www.ub.unibas.ch/tox/HBZ/HT014379790/PDF |q pdf |x VIEW |y Inhaltsverzeichnis | |
| 986 | |a SWISSBIB |b 198653212 | ||