<?xml version="1.0" encoding="UTF-8"?>
<collection xmlns="http://www.loc.gov/MARC21/slim">
 <record>
  <leader>     caa a22        4500</leader>
  <controlfield tag="001">445838418</controlfield>
  <controlfield tag="003">CHVBK</controlfield>
  <controlfield tag="005">20180317145336.0</controlfield>
  <controlfield tag="007">cr unu---uuuuu</controlfield>
  <controlfield tag="008">170323e20110201xx      s     000 0 eng  </controlfield>
  <datafield tag="024" ind1="7" ind2="0">
   <subfield code="a">10.1007/s10951-009-0159-z</subfield>
   <subfield code="2">doi</subfield>
  </datafield>
  <datafield tag="035" ind1=" " ind2=" ">
   <subfield code="a">(NATIONALLICENCE)springer-10.1007/s10951-009-0159-z</subfield>
  </datafield>
  <datafield tag="100" ind1="1" ind2=" ">
   <subfield code="a">MunierKordon</subfield>
   <subfield code="D">Alix</subfield>
   <subfield code="u">Laboratoire LIP6 4 place Jussieu, 75 252, Paris cedex 05, France</subfield>
   <subfield code="4">aut</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2="2">
   <subfield code="a">A graph-based analysis of the cyclic scheduling problem with time constraints: schedulability and periodicity of the earliest schedule</subfield>
   <subfield code="h">[Elektronische Daten]</subfield>
   <subfield code="c">[Alix MunierKordon]</subfield>
  </datafield>
  <datafield tag="520" ind1="3" ind2=" ">
   <subfield code="a">We consider in this paper a set of generic tasks constrained by a set of uniform precedence constraints corresponding to a natural generalization of the basic cyclic scheduling problem. The two parameters of any uniform constraint (namely the value and the height) between two tasks may be negative, which allows one to tackle a larger class of practical applications. We firstly study the structure and the existence of a periodic schedule. A necessary and sufficient condition for the existence of a schedule is then deduced. As there are no resource constraints, tasks following the earliest schedule have minimum average cycle times. The permanent state of the earliest schedule is characterized and we point out that the minimum average cycle times of tasks are equal for the earliest schedule and an optimal periodic schedule. An algorithm to check the existence of a schedule and to compute these minimum average cycle times using linear programming is lastly presented.</subfield>
  </datafield>
  <datafield tag="540" ind1=" " ind2=" ">
   <subfield code="a">Springer Science+Business Media, LLC, 2010</subfield>
  </datafield>
  <datafield tag="690" ind1=" " ind2="7">
   <subfield code="a">Cyclic schedules</subfield>
   <subfield code="2">nationallicence</subfield>
  </datafield>
  <datafield tag="690" ind1=" " ind2="7">
   <subfield code="a">Earliest schedules</subfield>
   <subfield code="2">nationallicence</subfield>
  </datafield>
  <datafield tag="690" ind1=" " ind2="7">
   <subfield code="a">Periodic schedules</subfield>
   <subfield code="2">nationallicence</subfield>
  </datafield>
  <datafield tag="773" ind1="0" ind2=" ">
   <subfield code="t">Journal of Scheduling</subfield>
   <subfield code="d">Springer US; http://www.springer-ny.com</subfield>
   <subfield code="g">14/1(2011-02-01), 103-117</subfield>
   <subfield code="x">1094-6136</subfield>
   <subfield code="q">14:1&lt;103</subfield>
   <subfield code="1">2011</subfield>
   <subfield code="2">14</subfield>
   <subfield code="o">10951</subfield>
  </datafield>
  <datafield tag="856" ind1="4" ind2="0">
   <subfield code="u">https://doi.org/10.1007/s10951-009-0159-z</subfield>
   <subfield code="q">text/html</subfield>
   <subfield code="z">Onlinezugriff via DOI</subfield>
  </datafield>
  <datafield tag="908" ind1=" " ind2=" ">
   <subfield code="D">1</subfield>
   <subfield code="a">research-article</subfield>
   <subfield code="2">jats</subfield>
  </datafield>
  <datafield tag="950" ind1=" " ind2=" ">
   <subfield code="B">NATIONALLICENCE</subfield>
   <subfield code="P">856</subfield>
   <subfield code="E">40</subfield>
   <subfield code="u">https://doi.org/10.1007/s10951-009-0159-z</subfield>
   <subfield code="q">text/html</subfield>
   <subfield code="z">Onlinezugriff via DOI</subfield>
  </datafield>
  <datafield tag="950" ind1=" " ind2=" ">
   <subfield code="B">NATIONALLICENCE</subfield>
   <subfield code="P">100</subfield>
   <subfield code="E">1-</subfield>
   <subfield code="a">MunierKordon</subfield>
   <subfield code="D">Alix</subfield>
   <subfield code="u">Laboratoire LIP6 4 place Jussieu, 75 252, Paris cedex 05, France</subfield>
   <subfield code="4">aut</subfield>
  </datafield>
  <datafield tag="950" ind1=" " ind2=" ">
   <subfield code="B">NATIONALLICENCE</subfield>
   <subfield code="P">773</subfield>
   <subfield code="E">0-</subfield>
   <subfield code="t">Journal of Scheduling</subfield>
   <subfield code="d">Springer US; http://www.springer-ny.com</subfield>
   <subfield code="g">14/1(2011-02-01), 103-117</subfield>
   <subfield code="x">1094-6136</subfield>
   <subfield code="q">14:1&lt;103</subfield>
   <subfield code="1">2011</subfield>
   <subfield code="2">14</subfield>
   <subfield code="o">10951</subfield>
  </datafield>
  <datafield tag="900" ind1=" " ind2="7">
   <subfield code="a">Metadata rights reserved</subfield>
   <subfield code="b">Springer special CC-BY-NC licence</subfield>
   <subfield code="2">nationallicence</subfield>
  </datafield>
  <datafield tag="898" ind1=" " ind2=" ">
   <subfield code="a">BK010053</subfield>
   <subfield code="b">XK010053</subfield>
   <subfield code="c">XK010000</subfield>
  </datafield>
  <datafield tag="949" ind1=" " ind2=" ">
   <subfield code="B">NATIONALLICENCE</subfield>
   <subfield code="F">NATIONALLICENCE</subfield>
   <subfield code="b">NL-springer</subfield>
  </datafield>
 </record>
</collection>
