Operation of a 150-t open-hearth furnace equipped with oxygen-gas roof burners

Verfasser / Beitragende:
[V. Kudrin, E. Popov, S. Afonikov, Yu. Nechkin, E. Tyurin, M. Lapshova, Yu. Nikolaev]
Ort, Verlag, Jahr:
1965
Enthalten in:
Metallurgist, 9/11(1965-11-01), 682-684
Format:
Artikel (online)
ID: 449392333