Observations of unloading of the walls of the underground machine hall of the Hoa Binh hydroelectric station during construction
Gespeichert in:
Verfasser / Beitragende:
[M. Ezerskii, S. Skiba, S. Bryukhov]
Ort, Verlag, Jahr:
1990
Enthalten in:
Hydrotechnical Construction, 24/5(1990-05-01), 319-323
Format:
Artikel (online)
Online Zugang: