<?xml version="1.0" encoding="UTF-8"?>
<collection xmlns="http://www.loc.gov/MARC21/slim">
 <record>
  <leader>     caa a22        4500</leader>
  <controlfield tag="001">475778316</controlfield>
  <controlfield tag="003">CHVBK</controlfield>
  <controlfield tag="005">20180406123637.0</controlfield>
  <controlfield tag="007">cr unu---uuuuu</controlfield>
  <controlfield tag="008">170329e20000201xx      s     000 0 eng  </controlfield>
  <datafield tag="024" ind1="7" ind2="0">
   <subfield code="a">10.1023/A:1008123115577</subfield>
   <subfield code="2">doi</subfield>
  </datafield>
  <datafield tag="035" ind1=" " ind2=" ">
   <subfield code="a">(NATIONALLICENCE)springer-10.1023/A:1008123115577</subfield>
  </datafield>
  <datafield tag="100" ind1="1" ind2=" ">
   <subfield code="a">Lee</subfield>
   <subfield code="D">Tae-Eog</subfield>
   <subfield code="u">Department of Industrial Engineering, Korea Advanced Institute of Science and Technology, Taejon, Korea</subfield>
   <subfield code="4">aut</subfield>
  </datafield>
  <datafield tag="245" ind1="1" ind2="0">
   <subfield code="a">Stable Earliest Starting Schedules for Cyclic Job Shops: A Linear System Approach</subfield>
   <subfield code="h">[Elektronische Daten]</subfield>
   <subfield code="c">[Tae-Eog Lee]</subfield>
  </datafield>
  <datafield tag="520" ind1="3" ind2=" ">
   <subfield code="a">We consider a cyclic job shop where an identical mixture of parts of different types, called a minimal part set (MPS), is produced repetitively in the same processing order. The precedence relationships among events (start of operation) are represented by a directed graph that has a recurrent structure. Each operation starts as soon as all its preceding operations are complete (called earliest starting). There is a class of desirable schedules that has the minimum cycle time and an identical schedule pattern for every MPS. By using linear system theory on minimax algebra, we characterize the set of all possible such schedules. We develop an efficient algorithm to find one among such schedules that minimizes a performance measure related to work-in-progress inventory. We also discuss an application to a flexible manufacturing system.</subfield>
  </datafield>
  <datafield tag="540" ind1=" " ind2=" ">
   <subfield code="a">Kluwer Academic Publishers, 2000</subfield>
  </datafield>
  <datafield tag="690" ind1=" " ind2="7">
   <subfield code="a">linear system</subfield>
   <subfield code="2">nationallicence</subfield>
  </datafield>
  <datafield tag="690" ind1=" " ind2="7">
   <subfield code="a">minimax algebra</subfield>
   <subfield code="2">nationallicence</subfield>
  </datafield>
  <datafield tag="690" ind1=" " ind2="7">
   <subfield code="a">cyclic job shop</subfield>
   <subfield code="2">nationallicence</subfield>
  </datafield>
  <datafield tag="690" ind1=" " ind2="7">
   <subfield code="a">scheduling</subfield>
   <subfield code="2">nationallicence</subfield>
  </datafield>
  <datafield tag="773" ind1="0" ind2=" ">
   <subfield code="t">International Journal of Flexible Manufacturing Systems</subfield>
   <subfield code="d">Kluwer Academic Publishers</subfield>
   <subfield code="g">12/1(2000-02-01), 59-80</subfield>
   <subfield code="x">0920-6299</subfield>
   <subfield code="q">12:1&lt;59</subfield>
   <subfield code="1">2000</subfield>
   <subfield code="2">12</subfield>
   <subfield code="o">10696</subfield>
  </datafield>
  <datafield tag="856" ind1="4" ind2="0">
   <subfield code="u">https://doi.org/10.1023/A:1008123115577</subfield>
   <subfield code="q">text/html</subfield>
   <subfield code="z">Onlinezugriff via DOI</subfield>
  </datafield>
  <datafield tag="908" ind1=" " ind2=" ">
   <subfield code="D">1</subfield>
   <subfield code="a">research-article</subfield>
   <subfield code="2">jats</subfield>
  </datafield>
  <datafield tag="950" ind1=" " ind2=" ">
   <subfield code="B">NATIONALLICENCE</subfield>
   <subfield code="P">856</subfield>
   <subfield code="E">40</subfield>
   <subfield code="u">https://doi.org/10.1023/A:1008123115577</subfield>
   <subfield code="q">text/html</subfield>
   <subfield code="z">Onlinezugriff via DOI</subfield>
  </datafield>
  <datafield tag="950" ind1=" " ind2=" ">
   <subfield code="B">NATIONALLICENCE</subfield>
   <subfield code="P">100</subfield>
   <subfield code="E">1-</subfield>
   <subfield code="a">Lee</subfield>
   <subfield code="D">Tae-Eog</subfield>
   <subfield code="u">Department of Industrial Engineering, Korea Advanced Institute of Science and Technology, Taejon, Korea</subfield>
   <subfield code="4">aut</subfield>
  </datafield>
  <datafield tag="950" ind1=" " ind2=" ">
   <subfield code="B">NATIONALLICENCE</subfield>
   <subfield code="P">773</subfield>
   <subfield code="E">0-</subfield>
   <subfield code="t">International Journal of Flexible Manufacturing Systems</subfield>
   <subfield code="d">Kluwer Academic Publishers</subfield>
   <subfield code="g">12/1(2000-02-01), 59-80</subfield>
   <subfield code="x">0920-6299</subfield>
   <subfield code="q">12:1&lt;59</subfield>
   <subfield code="1">2000</subfield>
   <subfield code="2">12</subfield>
   <subfield code="o">10696</subfield>
  </datafield>
  <datafield tag="900" ind1=" " ind2="7">
   <subfield code="a">Metadata rights reserved</subfield>
   <subfield code="b">Springer special CC-BY-NC licence</subfield>
   <subfield code="2">nationallicence</subfield>
  </datafield>
  <datafield tag="898" ind1=" " ind2=" ">
   <subfield code="a">BK010053</subfield>
   <subfield code="b">XK010053</subfield>
   <subfield code="c">XK010000</subfield>
  </datafield>
  <datafield tag="949" ind1=" " ind2=" ">
   <subfield code="B">NATIONALLICENCE</subfield>
   <subfield code="F">NATIONALLICENCE</subfield>
   <subfield code="b">NL-springer</subfield>
  </datafield>
 </record>
</collection>
