Mechanism of water inrush and quicksand movement induced by a borehole and measures for prevention and remediation

Verfasser / Beitragende:
[Guimin Zhang, Kai Zhang, Lijuan Wang, Yu Wu]
Ort, Verlag, Jahr:
2015
Enthalten in:
Bulletin of Engineering Geology and the Environment, 74/4(2015-11-01), 1395-1405
Format:
Artikel (online)
ID: 605454515
LEADER caa a22 4500
001 605454515
003 CHVBK
005 20210128100207.0
007 cr unu---uuuuu
008 210128e20151101xx s 000 0 eng
024 7 0 |a 10.1007/s10064-014-0714-5  |2 doi 
035 |a (NATIONALLICENCE)springer-10.1007/s10064-014-0714-5 
245 0 0 |a Mechanism of water inrush and quicksand movement induced by a borehole and measures for prevention and remediation  |h [Elektronische Daten]  |c [Guimin Zhang, Kai Zhang, Lijuan Wang, Yu Wu] 
520 3 |a In coal mining, a poorly sealed borehole is one of the channels that can lead to an inrush of water and quicksand movement, seriously compromising the safety of the coal mine. In this paper, we used the water inrush and quicksand incident at Longde Coal Mine as an example in order to investigate the mechanism of water inrush and quicksand movement induced by a borehole, as well as to develop measures for the prevention and remediation of such problems. Two sand funnel models and a water inrush outlet model are introduced from which to calculate the flow of the water and quicksand; a comparison of the two shows that the flow predicted by the water inrush outlet model is more consistent with observations from the accident than the sand funnel models. Based on the water inrush outlet model, the aquifer thickness and borehole diameter are the two key factors affecting the flow. The aquifer channel is inferred as tubular, with its diameter gradually decreasing from ground surface to underground, and a time-dependent surface subsidence model is constructed. Finally, we develop a prevention method, "Prior to mining development, borehole should be investigated and plugged for prevention,” and propose a remediation method, "Changing the pipeline flow into fracture flow, followed by changing the fracture flow into pore flow, and finally grouting and plugging.” 
540 |a Springer-Verlag Berlin Heidelberg, 2014 
690 7 |a Borehole  |2 nationallicence 
690 7 |a Water inrush and quicksand movement  |2 nationallicence 
690 7 |a Prevention or remediation  |2 nationallicence 
690 7 |a Sand funnel  |2 nationallicence 
690 7 |a Water inrush outlet  |2 nationallicence 
700 1 |a Zhang  |D Guimin  |u State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, 221116, Xuzhou, Jiangsu, China  |4 aut 
700 1 |a Zhang  |D Kai  |u State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, 221116, Xuzhou, Jiangsu, China  |4 aut 
700 1 |a Wang  |D Lijuan  |u School of Geodesy and Geomatics, Jiangsu Normal University, 221116, Xuzhou, Jiangsu, China  |4 aut 
700 1 |a Wu  |D Yu  |u State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, 221116, Xuzhou, Jiangsu, China  |4 aut 
773 0 |t Bulletin of Engineering Geology and the Environment  |d Springer Berlin Heidelberg  |g 74/4(2015-11-01), 1395-1405  |x 1435-9529  |q 74:4<1395  |1 2015  |2 74  |o 10064 
856 4 0 |u https://doi.org/10.1007/s10064-014-0714-5  |q text/html  |z Onlinezugriff via DOI 
898 |a BK010053  |b XK010053  |c XK010000 
900 7 |a Metadata rights reserved  |b Springer special CC-BY-NC licence  |2 nationallicence 
908 |D 1  |a research-article  |2 jats 
949 |B NATIONALLICENCE  |F NATIONALLICENCE  |b NL-springer 
950 |B NATIONALLICENCE  |P 856  |E 40  |u https://doi.org/10.1007/s10064-014-0714-5  |q text/html  |z Onlinezugriff via DOI 
950 |B NATIONALLICENCE  |P 700  |E 1-  |a Zhang  |D Guimin  |u State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, 221116, Xuzhou, Jiangsu, China  |4 aut 
950 |B NATIONALLICENCE  |P 700  |E 1-  |a Zhang  |D Kai  |u State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, 221116, Xuzhou, Jiangsu, China  |4 aut 
950 |B NATIONALLICENCE  |P 700  |E 1-  |a Wang  |D Lijuan  |u School of Geodesy and Geomatics, Jiangsu Normal University, 221116, Xuzhou, Jiangsu, China  |4 aut 
950 |B NATIONALLICENCE  |P 700  |E 1-  |a Wu  |D Yu  |u State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining and Technology, 221116, Xuzhou, Jiangsu, China  |4 aut 
950 |B NATIONALLICENCE  |P 773  |E 0-  |t Bulletin of Engineering Geology and the Environment  |d Springer Berlin Heidelberg  |g 74/4(2015-11-01), 1395-1405  |x 1435-9529  |q 74:4<1395  |1 2015  |2 74  |o 10064